Global Marines hydraulic pipe work
Global Marines - Wave Sentinel, Mechanical Services were required to replace all hydraulic pipe work, for the refitting of the A-frame to this vessel. This frame is used launch, tow and recover, a sea bed plough for Trans-Atlantic telecommunication cable laying.
Portland Pilot
One of the many commercial boats that we maintain for Portland Port
Landing Craft
Engines removed and new generator installed. Several additional structural sections were welded in to bring crafts to latest design
Landing craft was put on structural test rig (grey rig) undergoing lift tests to additional structural enhancements we fabricated and welded in. Also shown is the yellow lifting frame manufactured specifically by us for this project
RIB gear linkage
5m RIB, power head removed from one outboard of this commercial RIB to replace the gear linkage which had seized.
RMAS Newton
Replacement of the deck hatch base plate, to Lloyds quality standards
Condor Vitesse overnight repair
Various pictures taken while rebuilding the gearbox from one of Condors Fast Ferries. To give an idea of scale the diameter of the main bearing is 300mm, the gear teeth on the bottom gear again is also 300mm in height. On completion we reinstalled the complete gear box
RFA Largs Bay
We are very proud of our long and varied association with the M.O.D